Water intelligence platform — early access

Water is the
hidden bottleneck
in the AI buildout.

30% of AI data centers under construction are in water-stressed regions. Hydra scores any site on water viability before you commit capital — so you don't find out after the concrete is poured.

You're on the list — we'll be in touch.

No spam. Early access only. Unsubscribe anytime.

Water is the last variable anyone checks.

Site selection teams analyze power availability, land costs, connectivity, and zoning. Water gets a checkbox. If it passes, nobody looks closer.

That worked when data centers were modest. AI infrastructure is not modest. A single hyperscale campus draws as much water as a city of 50,000 people — every single day. The bottleneck is forming right now, in hundreds of projects, in real time.

30%
of data centers under construction sit in regions where water scarcity is projected to intensify by 2050
increase in Texas data center water consumption projected by 2030 — from 49B to 399B gallons annually
$0
cost of identifying water risk before land acquisition. Billions at stake once construction begins.
How it works

Site intelligence,
before you commit.

Input any location. Get a comprehensive water risk score across five dimensions, with 2030, 2050, and 2080 projections — in seconds, not weeks.

01 —

Score any site

Enter a lat/long, address, or data center name. Hydra returns a 0–100 Water Score with sub-scores across current scarcity, future projections, municipal capacity, permitting complexity, and regulatory trajectory.

02 —

Understand the risk

Hydra surfaces site-specific flags — aquifer type, drought classification, legislative pipeline, municipal capacity headroom — with plain-language context for each. No hydrology degree required.

03 —

Export and report

Download a full PDF site analysis ready for investment committee review, due diligence packages, or internal site selection workflows. API access available for integration into existing tooling.

Real sites. Real scores.

Based on WRI Aqueduct 4.0 data, USGS groundwater monitoring, and NOAA drought classifications.

Stargate Campus
Abilene, TX
31
Current scarcity22
2050 projection18
Municipal capacity38
Regulatory trajectory40
Critical risk — proceed with caution
Project Rainier
Indiana
74
Current scarcity78
2050 projection71
Municipal capacity76
Regulatory trajectory77
Low-moderate risk — favorable site
Phoenix Cluster
Phoenix, AZ
19
Current scarcity8
2050 projection6
Municipal capacity28
Regulatory trajectory22
Extreme risk — not recommended
Who it's for

Built for the people
making the decisions.

Data center developers

Site selection teams

Evaluate 50–200 sites per year. Replace $20–50K consultant engagements with a subscription that delivers water viability analysis in seconds, not weeks.

Infrastructure PE

Due diligence teams

Underwriting billions in data center assets annually. Add systematic water risk analysis to every investment thesis — the blind spot your current process is missing.

Hyperscalers

Real estate & infrastructure

Evaluating hundreds of sites globally. API-first access to water intelligence that integrates with existing site selection workflows and scales with your pipeline.

Consultants

Infrastructure advisors

CBRE, JLL, Turner & Townsend. White-label and channel partner programs available. Add water intelligence to your advisory offering — before your clients ask for it.

Know before
you build.

Join the waitlist for early access to Hydra. Design partner spots are limited — priority given to active site selection teams.

You're on the list — we'll be in touch.
You're on the list. We'll be in touch with early access details.